ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in Room 147.
  • The contractor continued welding connections for the chilled water lines on the 2nd Floor.
  • The contractor continued installing CMU block surrounding the storefronts and on the stairwell along Roman Street.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits on the 2nd level of the elevated structure.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor pulled wires for the A & B electrical riser to the new switchgear.