Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, SEPTEMBER 7, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in Stairwells A and B.
  • The contractor continued welding connections for the chilled water lines on the 2nd Floor.
  • Crews cleaned return air grilles and applied the first of two anti-microbial duct coatings.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits on the 2nd level.
  • They began repairing minor chips in the precast panels.
  • The contractor set the concrete forms and installed steel reinforcement for the parking curbs.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued terminating wiring in the switchgear.
  • The contractor removed the concrete block wall between Elevators 2 & 3 and removed the temporary elevator shaft wall in the elevator pit.
  • Workers are priming the walls in the mail room.

CEB COVERED WALKWAY:

  • The contractor continued to set wooden forms for the walkway at the Claiborne Avenue entrance to District Entergy garage.
  • Crews set rebar for the footers that run along the District Entergy garage.