Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, OCTOBER 11, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor applied the 2nd and 3rd coats of stucco to walls in offices on the 1st Floor. 
  • Studs were installed above the office storefronts on offices along Perdido Street. 
  • Crews continue to run heating hot water lines.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor began installing insulation on the roof of the new building.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed wooden forms for the elevator shaft walls at the freight elevator.
  • They energized the electrical bus duct riser on the Gravier side of the building (Riser B) with the new switchgear.
  • The contractor repaired three broken post tension cables in the concrete slab that forms the roof of the building.