Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, OCTOBER 12, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor applied the 2nd and 3rd coats of stucco to the stairwells along Bolivar Street and applied the first coat in the Tiger Room.  
  • Workers installed additional studs above the office storefronts on offices along Bolivar Street. 
  • The contractor set AHU-1A in place on the raised platform. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed pipes for the domestic water pumps.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to install wooden forms for the elevator shaft walls at the freight elevator.

CEB COVERED WALKWAY:

  • The contractor continued backfilling, grading and building the formwork for Canopy A (nearest District Energy Garage) and for the entire length of sidewalk between the District Energy Garage and the Clinical Education Building.