Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, OCTOBER 28, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor poured concrete outside the 2nd Floor building entrance off the walkway.
  • Crews continued applying 3rd coat of stucco above the storefronts along Bolivar Street and 1st coat of stucco above the storefronts along Perdido Street. 
  • They installed metal lathe and the 1st coat of stucco in the South Roman and Gravier Street stairwell.
  • Workers continued fabricating heating hot water lines for the 2nd Floor.
  • The contractor continued installing ductwork in Room 263.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractors began running the fuel line for the emergency generator.
  • Workers continued flashing the parapet wall. 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor applied the 2nd coat of waterproofing in the freight elevator pit. 

CSRB EXHAUST UPGRADE

  • The contractor finished removing the plaster ceiling from the corridor between Rooms 118-113.