ALLIED HEALTH/NURSING BLDD PERMANENT REPAIRS & MITIGATION:

  • Workers continued applying the 2nd coat of stucco above the windows along Perdido Street. 
  • The contractor continued fabricating heating hot water lines for the 2nd Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued running the fuel line for the emergency generator.
  • The new switchgear was put in place and crews began connecting the electrical conduit. 

CSRB EXHAUST UPGRADE:

  • The contractor removed the steel support for plaster ceiling that was removed from the corridor.

CEB COVERED WALKWAY:

  • The contractor continued building formwork for the grade beams at the end of the walkway closest to the Clinical Education Building.