THURSDAY, OCTOBER 7, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor applied the 2nd and 3rd coats of stucco to the stairwells along Bolivar Street.
- The contractor removed additional chilled water lines and ran insulated heating hot water lines.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor mounted 4 out of the 6 disconnect boxes on the roof platform.
- They primed the exterior wall of the Laundry Room in the 1st Floor, A tower.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor removed the elevator shaft wall at the freight elevator.
CEB COVERED WALKWAY:
- The contractor grouted 48 of 68 column base plates.
|