MONDAY, NOVEMBER 15, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing framing for the 2nd floor auditorium along the Gravier Street side of the building.
- Workers are insulating the heating hot water lines.
- They continued installing copper piping for the AHU in the 2nd Floor mechanical room.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor continued pulling wires for the switchgear on the 2nd Floor.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor continued to install elevator pit parts in the freight elevator.
CEB PERMANENT REPAIRS & MITIGATION:
- The contractor removed brick pavers near the existing generator in preparation for excavation.
CSRB EXHAUST UPGRADE:
- The contractor cut floor penetrations in the 3rd Floor mechanical room for exhaust duct riser #3.