ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued insulating the heating hot water lines.
  • Crews removed the 2nd Floor Womens restroom wall.
  • They continued demolishing the 2nd Floor corridor wall paralleling Gravier Street. 
  • The contractor bolted down the structural steel for the AHUs on the 1st Floor. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor terminated electrical wires for the ATS and the switch gear on the 2nd Floor.
  • Workers primed the CMU walls in the fire pump room and the domestic water pump room on the 2nd Floor.
  • Asphalt was laid in the trenches near the A tower and underneath the new addition building on the ground floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing the elevator pit parts in the freight elevator.
  • They began welding the fuel line in Room 139.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor cored drilled two 4-inch holes in the basement wall for the emergency electrical feeders.

CEB COVERED WALKWAY

  • Crews excavated trenches for grade beams adjacent to the canopy at the Clinical Education Building.

CSRB EXHAUST UPGRADE:

  • The contractor completed drilling the floor penetrations for exhaust duct riser #3 on the 2nd Floor.