ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor filled the heating hot water lines, found one leak and repaired the leak.
  • The insulating contractor continued to insulate the heating hot water lines. 
  • All of the remaining floor tile was removed from the 2nd Floor. 
  • The contractor hung sheet rock along the MEB side of the new auditorium.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor laid asphalt in the trenches near the C tower.
  • Workers pulled electrical wires for the campus standby power system.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued welding the fuel line near the Mens locker room on the 1st Floor.
  • The elevator contractor tested the operation of the freight elevator.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor installed electrical conduits underground through the basement wall for the emergency electrical feeders.

CEB COVERED WALKWAY:

  • Contractor removed the concrete forms from the entire length of the walkway that was poured last Friday.

DENTAL SCHOOL AIR HANDLING UNIT REPLACEMENT:

  • The contractor set the first of two temporary AHUs and ran electrical wires to the unit.