TUESDAY, NOVEMBER 9, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION
- The contractor installed studs for the 2nd floor auditorium along the MEB side of the building.
- They installed ductwork and VAVs for the 1st Floor, near the Mens restroom.
- Workers continued applied the 3rd coat of stucco for the stairwells along S. Roman Street.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor installed one door frame between the generator room and the switchgear room.
- They continued placing CMU block wall between the fire pump room and the switchgear room.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor installed fire caulking around the sump pump piping in the freight elevator pit.
- They installed pipe hanger for the diesel fuel line in Room 139.
|