Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, DECEMBER 13, 2010

ALLIED HEALTH PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running conduit for receptacles and light fixtures along Gravier Street on the 2nd Floor.    
  • The mechanical contractor ran condensate drains and heating hot water lines for the air handling units on the 1st Floor.      
  • The contractor removed louvers from the switchgear room located on 1st Floor. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor demolished the security office on the 1st Floor.
  • They began installing CMU block wall for the storage room in the C tower.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor set up the crane in the Foundation lot; preparing to lift the emergency generator and generator platform.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits in the basement to relocate existing electrical panels to the 1st Floor.

CSRB EXHAUST UPGRADE:

  • The contractor continued cleaning and removing the existing exhaust duct on the 1st Floor in the rear corridor.

DENTAL SCHOOL CAMPUS ROAD REPAIRS:

  • The contractor installed steel mesh in preparation for pouring concrete.
  • They placed silicone in the expansion joints in the roadway.