FRIDAY, DECEMBER 17, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continued running conduit for receptacles and light fixtures inside the auditorium and set can lights in the auditorium ceiling.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor completed installation of the roof-mounted emergency generator.
- The 1st Floor door to the freight elevator was repaired.
CEB PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing electrical conduits in the basement to relocate existing electrical panels to the 1st Floor.
CSRB EXHAUST UPGRADE:
- The contractor continued installing spiral ductwork in the 1st Floor ceiling.
DENTAL SCHOOL AHU REPLACEMENT:
- The contractor removed ceiling tiles in front of the gross anatomy and the pathology labs.