ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running conduit for receptacles and light fixtures inside the auditorium and hanging can lights in the auditorium.   
  • They installed insulation in the stud wall along the MEB loading dock area.      

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued making repairs to the main roof on the A-tower.
  • Two door frames were installed on the 2nd Floor of the new elevated structure.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to install the diesel fuel line on the 6th Floor.
  • Workers continued to repair the roof under the generator platform.
  • The contractor installed the cover of panel EMDP and electrical receptacles in the switchgear room.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits in the basement to relocate existing electrical panels to the 1st Floor.

CSRB EXHAUST UPGRADE:

  • The contractor continued installing new spiral ductwork on the 1st Floor.
  • Plumbing vent lines and fire alarm conduits were rerouted out of the ductwork path on the 1st Floor.
  • Crews began installing electrical conduit on the 7th Floor near the mechanical room. 

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor removed additional ceiling tiles and light fixtures from in front of the gross anatomy and the pathology labs. 

DENTAL SCHOOL CAMPUS ROAD REPAIRS:

  • The contractor installed parking gate control equipment at the entrance and exit roads.