CEB COVERED WALKWAY:

  • The contractor continued tack-welding the curved steel canopy supports for the walkway roof in place near the CEB.

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running conduit for receptacles on the perimeter of the auditoriums. 
  • The demo contractor continued removing the remaining metal studs and electrical conduit from the offices along Gravier Street.
  • The mechanical contractor continued installing ductwork in the 2nd Floor auditorium. 

CSRB EXHAUST PROJECT:

  • The contractor continued installing the temporary duct for phase 1 on the 1st Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued placing tack-coating in trenches in the main driveway.

DENTAL CAMPUS ROAD REPAIRS:

  • The contractor completed demolition of the driveway at Navy Blvd.