ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor ran conduit for electrical receptacles in the birthing labs. 
  • They began running conduit from the emergency generator to the ATS on the 2nd Floor.   
  • Workers continued to correct items on the stucco punch list.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor sealed the interior wall penetrations on the 2nd level of the new elevated structure.
  • They continued priming the exterior pre-cast concrete walls.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor removed the abandoned electrical conduit from the 1st Floor automatic transfer switch room.
  • The 2nd door was installed in the new switchgear room.
  • Crews continued painting the 1st Floor.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits in the basement in preparation to relocate existing electrical panels.
  • They began the excavation near the transformer vault in preparation for underground utilities.

CSRB EXHAUST UPGRADE:

  • Workers continued insulating the exhaust ductwork on the 1st Floor.
  • The contractor installed deionized water piping on the 1st Floor.
  • A floor penetration for the duct riser was cut in Room 729A.
  • The exhaust duct riser was installed in the 5th Floor south mechanical room.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued to fabricate and install the manifold system for the AHU above the Oral Pathology lab.  

DENTAL SCHOOL STUDENT RECREATIONAL FIELDS:

  • The contractor began the excavation and continued marking control points.