Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, JANUARY 25, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to correct items on the stucco punch list.
  • Workers continued running conduit from the emergency generator to the ATS on the 2nd floor and to relocate panel X1A (1st Floor emergency panel).   
  • The steel supports for the operating lights were installed in the birthing labs.
  • The contractor installed studs for the restroom on the 2nd Floor. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor began stripping the old paint in the A-tower laundry room.
  • They continued painting the interior wall in the switch gear and generator room on the 2nd level of the elevated mechanical/electrical enclosure.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor ran electrical conduit for the desk in the bookstore. 

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing elevator parts from the pit for elevators 7 and 8.
  • Workers continued removing existing heating water pipes and installing the 10 inch supply heating hot water pipe in the basement.

CSRB EXHAUST UPGRADE:

  • The contractor continued installing the exhaust duct riser in the 7th Floor (south) mechanical room.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued to fabricate and install the chilled water lines for the AHU above Oral Pathology.

DENTAL SCHOOL LIGHTING REPLACEMNT PROJECT:

  • The contractor replaced 20 additional light fixtures on the 6th Floor of the Clinic Building.