ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing the ceiling grid in the 1st Floor office area.   
  • Workers started framing the entryway furdown on the 2nd Floor. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor pulled the 2nd feeder for the A/C on the ground floor to the new switchgear.
  • They continued to caulk the exterior concrete panel of the new MEP building.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The fire pump has been set in place.
  • The new data drops were installed in bookstore.
  • The contractor continued painting areas on the 1st Floor.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing heating hot water and chilled water piping in the basement.
  • The sewer line was relocated and the trench has been backfilled.

CSRB EXHAUST UPGRADES:

  • The contractor applied the 1st of two coats of paint on the ceiling of the 1st Floor.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued fabricating valve package for the VAV boxes. 
  • The VAV boxes and supply ductwork for the unit above Oral Pathology were installed. 

DENTAL SCHOOL ATHLETIC FIELDS:

  • The contractor continued to clear and grub the field.

DENTAL SCHOOL LIGHTING REPLACEMENT:

  • The contractor installed an additional 21 light fixtures on the 5th Floor of the Clinic Building.