Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, APRIL 1, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing network drops on the 1st floor.
  • Workers began installing light fixtures in the 2nd Floor corridors.   
  • They continued welding structural steel below the walkway along the Gravier Street side of the building.   
  • Sheetrock was hung at both entrances of the 2nd Floor auditorium.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed 6 more doors (17 of 23 complete) and door hardware on the 1st Floor of the main building.
  • Crews removed the 2 old generators from the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing heat exchanger piping.
  • The existing heating water piping is being removed.
  • The contractor completed the final shot-blasting on 1st Floor in preparation for the epoxy flooring installation.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor completed erecting forms for the concrete walls that will enclose the passenger elevator #7 in the basement.
  • Crews continued welding and installing 8-inch chilled water pipes in the basement.

CEB COVERED WALKWAY:

  • The contractor continued installing metal roof panels and flashing on the intermediate canopies on the center section of walkway.

CSRB EXHAUST UPGRADE:

  • The contractor relocated the compressor for walk-in cooler 7G6.
  • New exhaust ductwork was installed in the feed room.

DENTAL CAMPUS PARKING LOT LIGHTING:

  • The contractor re-poured 3 of the new light pole bases deemed unacceptable after 1st pour and subsequently demolished.

DENTAL SCHOOL BLDG EXTERIOR WATERPROOFING:

  • The contractor removed existing caulk, ground the surfaces, and installed new caulk on the upper floor of the south side of the Clinic Building.