ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: 

  • The contractor continued prefabricating the chilled water lines.
  • Structural supports for the new monumental staircase were welded in place. 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued welding the fuel line casing on the 1st Floor.
  • The fire alarm system components are being installed.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduits on the 2nd Floor.
  • 8 of 12 forms for the pile caps have been set in the Lakeside lot.
  • Crews continued forming the freight elevator shaft wall in the basement.
  • The contractor installed the 6 inch domestic water supply line in the basement.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor began installing ductwork hangers.
  • Workers installed pitch pockets (roof penetrations for utilities) on the roof for exhaust systems 1 – 4.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing heating hot water lines for air handing unit 6A in the Clinic Building. 
  • Crews continued installing supply ductwork for unit 3A. 
  • The contractor continued insulating ductwork and heating hot water lines for unit 3A. 
  • Workers installed supply ductwork for unit L3A in the Administration Building. 

DENTAL SCHOOL BLDG EXTERIOR WATERPROOFING PROJECT:

  • The contractor began pressure washing the east side of the Power Plant building.
  • Crews continued removing existing caulk joint and installed new caulk for the columns on the ground floor of the Clinic and Administration Buildings.