  • The contractor continued installing conduit on the 2nd Floor and the steam supply line in the basement.
  • Crews continued building forms and installing steel rebar for the grade beam by the auditorium side of the building.
  • The contractor removed the concrete forms for the grade beam nearest the basement areaway.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor removed the ductwork in the BSL3 lab.
  • They continued installing electrical conduit on the 7th Floor for fan systems 9 and 10.
  • Workers continued installing the round exhaust ductwork for exhaust riser 10.
  • The contractor sealed the ductwork seams on the 2nd Floor.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued insulating the heating hot water line and supply ductwork for unit 6A.   
  • Crews are removing the old AHU 5A in the Clinic Building.
  • The contractor began removing light fixtures and ceiling tiles in the Library on the 3rd Floor of the Administration Building.