Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, SEPTEMBER 19, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor replaced smoke detectors in the elevator shaft for elevators # 7 and 8.
  • The motor starters for the parking garage exhaust fans were installed in Room 131.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor primed the plaster ceiling in the 2nd Floor corridors.
  • Workers continued to reroute electrical conduit around exhaust riser #1.
  • The new exhaust duct risers were connected to exhaust system #3.
  • The contractor continued insulating the duct riser for exhaust system #4.
  • They began removing the existing duct riser for exhaust system #3.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:  

  • The contractor pressure tested the ductwork on the 2nd and 5th Floors of the Clinic Building. 
  • Crews insulated heating hot water lines on the 5th Floor. 
  • The contractor installed new conduit for the light fixtures in the 2nd Floor mechanical room in the Clinic Building and connected wire to the VFD.
  • The chilled water lines are being run to AHU 2A. 
  • The contractor continued insulating the heating hot water lines in the Library.
  • All of the new light fixtures have been installed in the Library. 
  • The ceilings are being installed in the restrooms on the 3rd Floor.