CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued erecting steel for the new structure in the Lakeside lot.
  • Workers continued installing electrical conduit on the 1st Floor.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor installed light fixtures and diffusers in the plaster ceiling in the 2nd Floor corridors.
  • They began installing the Variable Frequency Drive (VFD) for exhaust system # 2.
  • The duct riser for exhaust system #3 is being installed.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued insulating the ductwork and heating hot water lines on the 5th Floor of the Clinic Building.   
  • They continued installing the main supply and return duct directly off the 5th Floor unit. 
  • Door frames were installed for the 2nd and 5th Floor mechanical rooms. 
  • Crews began installing the ceilings in the 5th Floor restrooms. 
  • The contractor continued insulating the heating hot water lines in the Library and installing the ceilings in the 3rd Floor (Administration Building) restrooms.