Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, SEPTEMBER 27, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing steel structure for the 3rd level of the new building in the Lakeside lot.
  • An electrical junction box was installed in Room 117.
  • Concrete was poured for the flood wall that will protect the parking garage.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor started installing the VFDs for exhaust system #1.
  • Workers installed ductwork in Room 630A and began the installation in Room 533A.
  • They continued installing the plaster ceiling in the feed room on the 1st Floor.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing supply and fresh air ductwork on the 2nd Floor of the Clinic Building.
  • Crews continued the ceiling installation in the 2nd and 5th Floor restrooms.
  • The contractor installed ceiling grid on the 5th Floor.
  • CMU blocks surrounding the 2nd and 5th Floor mechanical room door frames were installed.
  • The contractor installed 10 light fixtures in the study rooms in the Administration Building. 
  • The library stacks are being moved back into place.