Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, SEPTEMBER 30, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor welded handrails to the exterior stairs for the new building in the Lakeside lot.
  • Workers continued to install conduits along the 1st Floor corridor.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor continued installing the VFDs for exhaust system #1.
  • A pressure test was performed on the new exhaust riser for exhaust system #1.
  • The ceiling was removed from Room 326.
  • The contractor installed fire sprinklers in the feed room.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing supply and fresh air duct on the 2nd Floor of the Clinic Building.
  • They continued to install the ceilings in the 2nd and 5th Floor restrooms and the ceiling grid on the 5th Floor.
  • Crews continued insulating supply and heating hot water lines on the 2nd Floor.  
  • The abatement contractor abated the 5B mechanical room in the Clinic Building. 
  • The contractor started removing piping to L4C and L4D in the Administration Building.