CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 3rd level of the MEP building.
  • They are installing storm drain pipes on the 3rd level of the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor began installing the control wiring for exhaust system #9.
  • The new motor for fan EF1-1 was installed.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:   

  • The contractor completed installing chilled water lines for uni8t 6B in the Clinic Building.
  • Crews continued installing heating hot water lines for unit 6B.  
  • The contractor continued insulating the chilled and heating hot water lines for units 7A and 7D.
  • Unit 4A has been removed from the Clinic Building.
  • Workers continued installing ductwork and VAVs for the new unit 4A.   
  • The contractor continued setting units L2B and L3B in the Administration Building.   
  • They started installing the ductwork and VAVs for unit L2B. 
  • The contractor continued installing lights in the Library. 
  • Crews continued insulating the new ductwork for units L4C and L4D.