WEDNESDAY, NOVEMBER 30, 2011
CEB PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing conduit and storm drain pipes on the 3rd level of the MEP building.
CSRB EXHAUST UPGRADE PROJECT:
- The contractor installed the fan motor EF-1C.
- The control panel enclosure for fan system #2 was installed.
DENTAL SCHOOL AHU REPLACEMENT PROJECT:
- The contractor finished installing the heating hot water lines for unit 6B in the Clinic Building and began to pressure test the lines. 
- Crews continued installing the 7th Floor Men’s restroom ceiling.  
- The contractor continued installing ductwork and VAVs for unit 4A and started installing the heating hot water lines. 
- The mechanical room CMU block wall for unit 4A is being removed. 
- The contractor continued installing ductwork and VAVs for unit L2B in the Administration Building and pressure tested the ductwork. 
- They completed insulating heating hot water lines for unit L3B.
- The mechanical room CMU walls for units L2B and L3B are being constructed. 
- The contractor started installing control wire for units L2B and L3B.