Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, NOVEMBER 4, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued constructing the CMU wall for the transformer vault.
  • They continued installing conduits in the 3rd Floor corridor leading to the MEP building.
  • Crews continued to install the metal deck on the 4th level of the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor continued installing conduit for the controls of fan system #4.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing supply ductwork and VAVs for unit 6B.
  • Workers continued installing transition supply ductwork, chill water lines, and heating hot water lines for unit 7A.
  • The contractor continued installing heating hot water lines and outside air ductwork for unit 7D.
  • They continued installing control wiring for the 2nd and 5th Floors. 
  • Crews continued installing and insulating ductwork and installing heating hot water lines in the Library.
  • The contractor continued replacing the CMU block wall of the mechanical room on the 4th Floor of the Administration Building.   

DENTAL SCHOOL ADMIN. BLDG 1ST FL. ABATEMENT:

  • The contractor continued removing ductwork and insulation from the 1st Floor.