CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit and storm drain pipes on the 3rd level of the MEP building.
  • They poured concrete for the steps to the loading dock, the roof of the new transformer vault, and areaways 5, 6, and 7.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor installed the fan motor EF-2A.
  • The control panel enclosure for fan system #4 was installed.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing the Men’s restroom ceiling on the 7th Floor of the Clinic Building.
  • They pressure tested ductwork and continued installing heating hot water lines for unit 4A. 
  • The contractor started balancing units 5A and 5B. 
  • Crews continued installing ductwork and VAVs for unit L2B in the Administration Building. 
  • The contractor started installing chill water valves and continued installing control wire for units L2B and L3B. 
  • They finished the installation of the mechanical room CMU wall for units L2B and L3B.