Rounding changes are displayed in the Payable Time section. The Payable Total for Week 1 is 56.10 and 23.90 for Week 2. The Total Period Hours are 80.00.
NOTE: The Cumulative column total in the timesheet is 79.72. The Cumulative total does not reflect rounding changes and will remain unchanged when Time Admin is run.