In the Time Sheet Report topic you will learn how to run the report to correct an employee's previous payroll period.
Steps:
Navigate to the TimeSheets Report by:
Clicking the Main Menu> LSUHSC Processes>Time and Labor>Report>
Step 1Click the TimeSheets Report menu.
Step 2Click the Search button to select a Run Control ID.
Note: If no results are returned, you will need to click the Add a New Value tab to create a Run Control ID.
Step 3Click the Run_All_Report link.
Step 4Note: The beginning and ending payroll period Dates must be entered in order to run the Report successfully. Failure to enter the correct payroll period dates will produce an error when running the report.
Click the Choose a date button.
Step 5Click the Previous Month button.
Step 6Click the desired date.
Step 7Click the Choose a date button.
Step 8You can select a month from the drop-down list.
Click the month drop-down arrow.
Step 9Click the March list item.
Step 10Click the desired date.
Step 11Enter the 7-diget Employee ID number into the View All field. Enter "0000000".
Step 12To print the report for more than one employee, click the Add a new row at row 1 button to add another employee.
Step 13Notice a second row was added. If the row is not needed.
Click the Delete row 2 button.
Step 14Click the OK button to confirm the delete process.
Step 15Click the Save button.
Step 16Click the Run button.
Step 17If the Server Name is PSNT, then click the OK button to continue.
Note: If the Server name is NOT PSNT, click the drop-down arrow and select it from the list.
Step 18Click the Process Monitor link.
Step 19Click the Refresh button every 10 seconds or so until you receive the following status:
Run Status = Success
Distribution Status = Posted
Step 20Click the Go back to TimeSheet Report link.
Step 21Click the Report Manager link.
Step 22Click the TimeSheets Link to view the report.
Step 23Click the Zoom Menu drop-down button to increase the size of the report on the screen.
Step 24Click the Print Icon to print the report.
Step 25To close the report, click the "X" at the top right of the screen.
Step 26In the appropriate date column note the employee's payroll
information you want to correct for the specified payroll period.
Example: The employee took 8 hours of annual leave on
Monday March 5, 2012, but the annual leave was not recorded
correctly for this payroll period.
To correct the error, write the correct information on the timesheet,
have the employee sign the timesheet, then send the timesheet to the
Payroll Department for processing.
The correction will be processed on the next payroll period.
Step 27To close the report, click the "X" at the top right of the screen.
Step 28This completes the topic on how to run a Time Sheet Report.