Screen image of this step


A Run Control ID must be created to run the Attendance History report. The same Run Control ID can be used when running the Attendance History Report in the future.

 

A Run Control ID is used to access the Process Scheduler. You may save parameters related to a particular process or report with a run control to minimize data entry when running recurring processes and reports. If you select Find an Existing Value to use an existing Run Control ID, the Attendance History report page displays the information from the most recent Print Request.

 

A Run Control ID is:

1. Specific to the end-user’s Operator ID;

2. Can be entered in upper case, lower case, or mixed case;

3. Must be one continuous string of words (maximum of 30 characters). If it consists of more than one word the Run Control ID cannot contain a blank space between the words or must be connected by an underscore.

Next Step


Table of Contents  Topic Overview